Arrowtown Fuel Depot
Client: Mansfield Installations Ltd
Excavation of 1,100 m3 of site material to a depth of 4.0 m to allow the installation of two large in ground fuel tanks andon-site stormwater pads. Base installed the reticulated pipeworks and services with Mansfield Installations and backfilled /fabric wrapped with approx. 750 m3 of drainage gravel.
• Fuel Tank • Stormwater • Reticulated Pipework
Millbrook Stage 3C
Client: Signal Group
1.5 km of stormwater, wastewater, water & 3 km of power, telecommunications, gas, reticulated services and 18 manholes for a 15 lot subdivision at Millbrook West. Deep blasted rock (500 m3) for the services and winter conditions made the project challenging and health & safety focused. All backfilling was fully engineered and certified.
• Stormwater • Wastewater • Telecommunications • Gas